Why no numbers appear on this page
It is a fair question to ask of a page called Packages, so here is the answer in full.
A slide count and a price printed on a website are a promise made before anyone has seen the job. Yours might be twelve slides of text you have already written, or twelve slides that need three diagrams drawn from scratch. Those are not the same piece of work, and a figure that covers both would be wrong for one of you.
So the packages exist, they are built by slide count, and their boundaries, contents and prices are settled in a written quote once there is something to quote against. It takes a short email and it means the figure you are given is the figure you pay.
The quote is in pounds sterling. It is the full price, with tax included, and nothing is added to it afterwards. If the job changes along the way, the change is quoted and agreed before it is carried out.
What moves a job up a package
Slide count sets the package. These are what decide where a job sits inside it, and they are the things worth mentioning in your first email.
Ask for the figure
A rough slide count and a sentence about the offer are enough to quote from. Use the form, or write to contact@yes.it.com and attach what you have.
